In 2006 Chemex was purchased by Cowhouse Partners, a Texas-based oil and gas company. The following table is a partial list of projects worked on by the combined companies of Chemex, Val Verde and Cowhouse:
Year |
Client/Location |
Size |
Brief Description |
2006 |
Husky Energy, Inc.
Lloydminster, Alberta |
25,000 bpd refinery |
Asphalt facility de-bottlenecking and upgrades |
2006 |
Niger Delta Petro
Ogbelle, Nigeria |
5,000 bpd |
Built a 5 well manifold extension for an existing Refinery in Nigeria |
2005 |
Fuel Processing Operators
El Mirage, Arizona |
2,800 bpd |
Upgraded existing facility process, load rack and provided commissioning and operations. |
2005 |
Earth Energy
Utah |
250 bpd |
Supplied and turnkey installed a new surplus processing unit. |
2005 |
Niger Delta Petro
Ogbelle, Nigeria |
15,000 bpd |
Crude oil processing plant, supplied new surplus and turnkey installed. |
2004 |
Crown Asphalt Products
Woods Cross, Utah |
Asphalt Terminal |
PMA Plant Upgrade |
2004 |
Golden Gate Petroleum
Sparks, Nevada |
1,000 bpd |
Fabrication and construction of a Transmix Distillation Unit and Products Load Rack |
2003 |
Seminole Transportation
Dumas, Texas |
-- |
Installation of a gas liquids terminal |
2003 |
Doyle Ellis
Bakersfield California |
1,200 tons per day |
Install asphalt facility, on-site assistance, construction, and final commissioning. |
2003 |
Siberia |
1,000 bpd |
Crude Oil HI-TEC 10-30 supplied and erected in Siberia. |
2002 |
Bulgaria |
6,000 bpd |
Designed and fabricated a crude distillation unit and 2,000 bpd splitter. Turnkey installed at site in Bulgaria. |
2002 |
Sinclair Refinery
Sinclair, Wyoming |
66,000 bpd refinery |
Provided turnkey installation services to upgrade asphalt production capabilities |
2001 |
EOPT
Nampa, Idaho |
400 bpd |
Upgrade and de-bottleneck an existing used oil processing facility. |
2001 |
Canada |
6,000 bpd |
Refurbished and shipped a Val Verde Crude Oil Distillation Unit to Canada |
2001 |
Thailand |
20,000 bpd |
Supplied a new surplus crude distillation unit to SGPL in Thailand |
2000 |
Niger Delta Petro
Ogbelle, Nigeria |
15,000 bpd |
Flow Station designed and fabricated a 15,000 bpd flow station for installation in Nigeria |
1999 |
Sakhaneftegas
Republic of Sakha, Russia |
625 bpd ADU |
Skid-mounted modular refinery |
1999 |
Russia |
2,000 bpd |
Refurbished a 2,000 bpd crude unit for a Russian client |
1999 |
GAOR
Republic of Georgia |
2,000 bpd |
“Turnkeyed” a second crude unit at GAOR in Republic of Georgia |
1999 |
Ultramar
St-Romuald, Quebec |
215,000 bpd refinery |
Upgrade existing asphalt facilities with 1,200 ton per day skid-mounted PMA plant. |
1998 |
Equilon
Phoenix, Arizona |
1,000 bpd |
Fabricate and install transmix processing unit. |
1998 |
Republic of Georgia |
2,000 bpd |
Crude Oil Fractionation Unit refurbished and installed “turnkey” in Republic of Georgia |
1996
to
1998 |
Dagestan, Russia |
2,000 bpd
and
6,000 bpd |
Naphtha Hydrotreater /Reformer completely refurbished and shipped to Dagestan
Crude Oil Fractionation Unit completely refurbished and shipped to Dagestan |
1997 |
Concorp/ Sudan, Africa |
1,500 bpd |
Reformer & Hydrotreater (Heavy Naphtha) Moved to Africa for erection |
1997 |
The Republic of Georgia |
2,000 bpd |
Moved, installed and commissioned a crude fractionation unit on a “turn key” basis in The Republic of Georgia. |
1997 |
The Commonwealth of Independent States |
2,000 bpd |
Moved a crude fractionation unit to The Commonwealth of Independent States |
1997 |
Alabama, USA |
5,000 bpd |
Commissioned fractionation unit and 2,000 bpd splitter to produce specialty solvents in Alabama, USA |
1997 |
Fina Oil & Chemical Co.
Big Spring, Texas |
70,000 bpd refinery |
Upgrade existing asphalt facility to include a new 1,300 ton per day PMA plant. |
1996 |
Persian Gulf |
50,000 bpd |
Sold this unit to a client who erected the refinery in the Persian Gulf and commissioned it in 1997 |
1996 |
Mitchell Energy Bridgeport, TX/ EL Obied, Sudan, Africa Refinery |
10,000 bpd ADU |
Sold the unit for Mitchell Energy in Bridgeport, TX. Then erected and commissioned the remanufactured unit as a turn key project in Africa. |
1995 |
Europe Refinery |
100,000 bpd |
Procured this refinery for a client for relocation in Asia. |
1995 |
Shreveport Refinery
Shreveport, LA |
4,000 bpd |
Purchased, refurbished and relocated this refinery unit to Russia |
1995 |
Pertamina Refinery
Indonesia |
-- |
Supplied a new self-contained unit that processes various refinery sludge streams, recovering hydrocarbons, water and solids. |
1995 |
BASF
Mannheim, Germany |
125,000 bpd |
Sold the unit for relocation in India. |
1994 |
Chernogomeft, Ltd
Nizhnevartovsk, Russia |
3,000 bpd |
Skid-mounted modular refinery |
1994 |
Chevron
Cincinnati, OH |
22,000 bpd |
Cat cracker (FCCU), 12,000 bpd hydrotreater/reformer: dismantled and shipped for erection in Far East Asia |
1994 |
Chevron
Richmond, CA |
60,000 bpd |
Sold, dismantled, and shipped unit to Asia |
1993 |
Chevron
Richmond, CA |
30,000 bpd |
Sold, dismantled, shipped and assisted in erection/startup of the unit in the Middle East |
1993 |
Flying J Refinery
Williston, ND |
5,000 bpd |
Purchased, match marked, and dismantled. Sold the HDS/reformer, LPG, Isom and dewax units for relocation in the USA |
1992 |
Eagle Refinery
Jacksboro, TX /
Muglid, Sudan, Africa |
2,000 bpd ADU |
Dismantled, refurbished, re-erected, and comissioned this unit in Sudan, Africa |
1992 |
Chevron Oil of Sudan |
-- |
Sold the concession: 42,000,000 acres, 3.5 billion bbl reserve |
1991 |
Glenrock Refinery
Glenrock, WY/
Concorp Sudan, Africa |
5,000 bpd |
Sold the unit to Concorp for relocation in Sudan, Africa. Match marked, dismantled, and shipped unit |
1990 |
Newhall Refinery
Newhall, CA |
25,000 bpd |
Dismantled the refinery and relocated several units |
1988 |
Chevron Refinery
Bakersfield, CA |
30,000 bpd |
Dismantled refinery and relocated several units including a 6,000 bpd naphtha hydrotreater/reformer |
1988 |
Texas Gulf Gas Corporation
Houston, TX |
1,500 bpd |
Skid-mounted modular refinery |
1987 |
Beacon Refinery
Hanford, CA |
30,000 bpd |
Dismantling and relocation of the crude units, naphtha hydrotreater/reformer and Stretford Gas Plant |
1985 |
Val Verde Refining
Houston, TX |
6,000 bpd |
Skid-mounted modular refinery |
1984 |
Chaparral Refining
Corpus Christi, TX |
1,500 bpd |
Skid-mounted modular refinery |
1981 |
Glacier Park (Burlington)
Osage, WY |
6,000 bpd |
Skid-mounted modular refinery currently located at Petro Star in North Pole, Alaska |
1980 |
Olmin, N L
Alice Springs, Australia |
700 bpd |
Skid-mounted modular refinery |
1980 |
Olmin, N L
Alice Springs, Australia |
700 bpd |
Skid-mounted modular refinery |
1980 |
Petro Processors, Inc
Brownsville, TX |
700 bpd |
Skid-mounted modular refinery |
1979 |
LaCoste Refining, Inc
LaCoste, TX |
5,000 bpd |
Skid-mounted modular refinery |
1977 |
Pioneer Refining
Nixon, TX |
5, 000 bpd |
Skid-mounted modular refinery with splitter |
1976 |
BiPetro, Inc
Springfield, Il |
1,000 bpd |
Skid-mounted modular refinery |
1976 |
Government of Nigeria |
5,000 bpd |
Skid-mounted modular refinery with stabilizer |
1975 |
Glacier Park (Burlington)
Osage, WY |
1,000 bpd |
Skid-mounted modular refinery |
1975 |
Glacier Park (Burlington)
Osage, WY |
1,000 bpd |
Skid-mounted modular refinery |
1975 |
Glacier Park (Burlington)
Osage, WY |
1,000 bpd |
Skid-mounted modular refinery |
1975 |
Glacier Park (Burlington)
Osage, WY |
1,000 bpd |
Skid-mounted modular refinery |
1975 |
United Independent Oil
Tacoma, WA |
1,000 bpd |
Skid-mounted modular refinery |
1974 |
Pioneer Refining, Inc
Nixon, TX |
1,000 bpd |
Skid-mounted modular refinery |
1974 |
Pioneer Refining, Inc
Nixon, Texas |
1,000 bpd |
Skid-mounted modular refinery |